We build filling stations from start to finish
The structures in our photographs were built by Ensign, including filling stations and fuel depots. We do not hand the job from one firm to the next. The same team that surveys your site builds on it.
- Survey and set out the site
- Concrete, drainage and civil works
- Canopies, buildings, gas installations and fire pump houses
- Paved forecourts, finishing and handover

Clients and work
Our clients include Rainoil Ltd., AA Rano Nigeria Ltd. and several state governments. Here is a sample of what we have delivered with them.
Rainoil Ltd.
Infrastructure for the Ijegun Depot: bund walls, service lanes, walkover steps and concrete flooring, plus the reclamation of 9,345 m² of land with perimeter fencing. Earlier work includes setting out bulk storage tank foundations and a bathymetric berthing assessment at Oghara.
Lagos and Delta StateAA Rano Nigeria Ltd.
Supervision of a lubricant plant's construction and survey works for gas bottling facilities. We also set out and positioned features at the Ijegun LPG depot and jetty, and surveyed a 13,435 m² lubricant plant site.
Lagos and KanoShiroro Dam reservoir
A bathymetric survey to determine siltation, with horizontal and vertical control established over a distance of 100 km around the reservoir. Client: Power Holding Nigeria Limited.
Niger StateState governments
Delta State Modern Markets, flood control surveys in Delta State, and drainage desilting in Umuahia for the Abia State Government.
Delta and Abia StatesHomes, missions and institutions
Homes, duplexes and flats for private clients, and mission houses, church auditoriums and institutional layouts for organisations such as Christ Apostolic Church and the Breath of God Mission.
Lagos and other states
On site
Every structure in these photographs was built by Ensign. Select any photo to enlarge it.
Tell us about your site
Tell us where it is and what you need measured, built or checked. A real person will get back to you with the next steps.